WPM CRACK INDUCER profilio istorija
CRACK INDUCER profilis buvo sukurtas 2018 m., kai tuometinis „Primostar OÜ“ generalinis direktorius Indrek Uusalu, kasdien dirbęs su hidroizoliaciniais produktais ir „Traveter Ehitus OÜ“ gaminiais, nusprendė pats pradėti gaminti profilius Estijoje. Šešiolikos metų patirtis hidroizoliacijos srityje leido pastebėti rinkos trūkumus. Indrek nusprendė, kad gali juos išspręsti.


Todėl 2018 m. rugpjūtį buvo įsteigta betono konstrukcijų siūlių ir kontroliuojamų įtrūkių sandarinimo sprendimais užsiimanti bendrovė „WPMEstonia OÜ“. Kadangi dešimt metų hidroizoliacijai buvo naudojamas kristalinis priedas – paaiškėjo šios sistemos trūkumai. Kaip sprendimas buvo sukurtas kaiščio formos
Kas yra WPM CRACK INDUCER profilis?
The WPM CRACK INDUCER profile is part of a three-part waterproofing solution or “white tank” method. The profile is designed to work with other WPM construction joint profiles and crystalline admixture.
By its nature, the WPM CRACK INDUCER profile creates a pin-shaped crack in the concrete structure when it adheres tightly to the concrete. Perpendicular to it is a perforated steel sheet with a mineral coating that makes the resulting shrinkage crack waterproof and thus prevents water from penetrating the building. The purpose of the pin-shaped crack is to maintain the strength of the structure so we can use the profile in load-bearing structures.
Kokia yra profilio paskirtis?
Šio profilio paskirtis – supaprastinti gelžbetoninių konstrukcijų hidroizoliaciją ir pagreitinti betono liejimo darbus. Betono konstrukcijos paprastai liejamos etapais, siekiant sumažinti dėl betono susitraukimo jam džiūstant atsirandančius įtrūkimus, tačiau naudojant WPM CRACK INDUCER profilį galima kontroliuoti atsirandančius susitraukimo įtrūkius, o profilį apsaugoti vandeniui nelaidžiu plieno lakštu.
Kaip naudoti WPM CRACK INDUCER profilį betono konstrukcijose?
Profilis montuojamas tarp sienos, lubų ir grindų konstrukcijos armatūros. Atstumai tarp profilių apskaičiuojami atsižvelgiant į betono susitraukimą. Tai reiškia, kad tarpai tarp profilių turi būti pakankamai dideli, kad būtų išvengta bet kokių dėl susitraukimo atsirandančių įtrūkių, į kuriuos nebuvo atsižvelgta.
Kaip profilis užtikrina betono konstrukcijos atsparumą vandeniui?
Džiūdamas betonas traukiasi, todėl konstrukcijoje atsiranda įtrūkių. Skaičiavimai padeda nustatyti, kuriose vietose įtrūkių kontrolei ir hidroizoliacijai yra tikslingiausia įrengti WPM CRACK INDUCER profilį. Konstrukcijos atsparumą vandeniui užtikrina profilio padarytame kaiščio formos įtrūkyje veikiantis statmenas plieninis lakštas. Statmenas plieninis lakštas kaiščio formos įtrūkyje veikia kaip užtvara.


Kaip naudojant WPM CRACK INDUCER profilį per trumpesnį laiką išlieti daugiau betono?
As we know, concrete is a material that shrinks as it hardens, so it is necessary to consider this when constructing the structure. We can reduce the shrinkage by adding more reinforcement rebars to the concrete. In principle, if desired, it is possible to pour the concrete with a more considerable amount of reinforcement than usual without shrinkage. This means that if the amount of iron in the structure is such that the tensile strength of the reinforcement exceeds the tensile strength of the concrete, no shrinkage cracks will occur. However, this would raise the construction cost unreasonably high, and this approach is generally not used.
This is where the efficiency of the WPM CRACK INDUCER profile comes in. It allows you to keep the amount of reinforcement in the design reasonable and enable the profile to create controlled cracks exactly where we want them.
Because the profile allows us to control shrinkage cracks and make them waterproof, we don’t have to worry about accidental cracks when pouring large amounts of concrete at once. In this way, after the concrete has hardened, we can pour all the walls simultaneously. The same applies to the basement ceilings.
However, we would like to point out that the pouring pipe has to be as low as possible at the bottom of the formwork when pouring concrete into the formwork. In that way, it does not separate the concrete mixture into larger and smaller parts of the concrete if it falls to the base against the edge of the reinforcement. In this case, larger pieces usually fall to the bottom of the floor before and do not allow to form a dense concrete form around the construction joint profile or WPM CRACK INDUCER profile. This, in turn, is likely to cause water to seep through the structure. We have seen this problem times and times again over the years and have eliminated the consequences. From experience, we can make recommendations to help you avoid these costly mistakes.
We are aware of the routines of how concrete is poured. Still, in our opinion, a well-thought-out, careful, and perhaps a little more timely casting process outweighs the leaking structure, which must be re-waterproofed with additional resources later.
Kokiose objektuose naudojome WPM CRACK INDUCER profilius?
Įtrūkių formavimo profilį naudojome šiuose objektuose:
Estijoje:
- Kiikri 6, Tallinn
- TÜ Kliinikumi juurdeehitus, Tartu
- Taime 6, Tallinn
- Tammsaare 86, Tallinn
- Valge 16, Tallinn
Latvijoje: - Tērbatas iela 72, Riga
- Rūpniecības iela 27, Riga
- Marijas iela 2a, Riga
- Lauku iela 23, Riga
Lietuvoje: - Manufaktūrų g. 7, Vilnius.
3D Automatic Crack Inducer Calculator (3D automatinis „Crack Inducer“ skaičiuotuvas)

Kad profilių montavimas būtų dar paprastesnis, sukūrėme 3D automatinį įtrūkių formavimo skaičiuotuvą (3D Automatic Crack Inducer Calculator). Skaičiuotuvas apskaičiuoja, kiek WPM CRACK INDUCER profilių reikia konstrukcijai ir tikslias jų montavimo vietas. Skaičiuotuve taip pat rodomi visi kiti reikiami darbinių siūlių profiliai ir jų montavimo vietos. Į skaičiuotuvą tereikia įvesti konstrukcijos storį, aukštį bei ilgį ir jis automatiškai apskaičiuoja reikiamą profilių kiekį, parengia konstrukcijos 3D brėžinį, kurį galima peržiūrėti 360° kampu ir atspausdinti.
Apibendrinimas
The WPM CRACK INDUCER profilis turi dvi paskirtis:
- apsaugoti nuo vandens įsiskverbimo dėl susitraukimo atsirandančius įtrūkimus,
- kontroliuoti dėl susitraukimo atsirandančius įtrūkimus, kad būtų galima išlieti daugiau betono ir sutaupyti laiko.
Nedideli skaičiavimai rodo, kad betoninių konstrukcijų liejimui ir hidroizoliacijai naudojamas WPM CRACK INDUCER profilis stipriai taupo lėšas ir laiką. Palyginti su ritininėmis membranomis ar inkarinėmis hidroizoliacinėmis medžiagomis, šis profilis padeda beveik perpus sumažinti hidroizoliacijos sąnaudas.
Skaičiavimai su medžiaga ir darbo valandomis:
Kainos 2022 metais | Hidroizoliacija su membrana (juodojo bako metodas)
|
Hidroizoliacija su kristaliniu priedu ir WPM profiliais (baltojo bako metodas)
|
Konstitucija
| 3200m2 x 35€ = 112 000€ | 1000m3 x 3kg = 3000kg x 6.90€ = 20 700€ |
Sienos | 1700m2 x 22€ = 37 400€ |
425 м3 × 3 кг = 1275 кг × 6,90 € = 8 797,5 €
|
Lubos (-1)
| 3200m2 x 20€ = 64 000€ | 1000m3 x 3kg = 3000kg x 6.90€ = 20 700€ |
Lubos (0)
| 3200m2 x 20€ = 64 000€ | 1000m3 x 3kg = 3000kg x 6.90€ = 20 700€ |
WPM CRACK INDUCER
| – | 660m x 51.50€ = 33 990€ |
WPM SEALING ELEMENT
| 500m x 10€ = 5000€ | 500m x 10€ = 5000€ |
Armatūra / armatūros
| 1000m x 10€ = 10 000€ | 1000m x 10€ = 10 000€ |
Sum
| 292 400€ | 119 887.5€ |
Profilis WPM CRACK INDUCER yra bendrovės „WPMEstonia OÜ“ sukurtas produktas, kuriam šiuo metu yra pateikta patento paraiška.
Jeigu norite sužinoti, ar galime ir kaip „baltosios vonios“ metodu hidroizoliuoti jūsų betono konstrukcijas ir pagreitinti betono liejimo procesą, susisiekite su mumis ir kartu peržiūrėsime projektą.